Back to projects
Construction of roads - Azerbaijan
Alat-Adjikabul highway
The customer was "Ministry of Digital Development and Transport of the Republic of Azerbaijan".
The length of the motor highway was 20 km. Asphalt pavement was made according to the type I technical category.
The completed works of the "EVRASCON" Corporation are:
- 3 bridge size - S = 15.0 + 1.5 + 15 + 2 x 0.75 with a length of 150 m;
- 22 artificial structures;
- Embankment - 1.4 mln/m³;
- Excavation - 0.202 mln/m³;
- Base course - 0.118 mln/m³;
- Bedding course - 0.105 mln/m³;
- Asphalt concrete pavement - 150 000 m²;
- Pavement milling - 145 000 m²;
- Bottoming "cold deep in-place recycling" - 260 000 m².
Tweet
Share
Telegram
WhatsApp