Back to projects
Construction of bridges - Azerbaijan
Bridge across the Kura River on the M6 Adjikabul-Goradiz road
The project of reconstruction of the 600 km section of Azerbaijan Republic highways is one of the largest reconstruction projects, part of the section of which was M6 Hajikabul-Horadiz - a bridge over the Kura River. The implementation of this site was entrusted to EVRASCON Corporation.
The bridge span is represented in the form of a continuous beam and a monolithic prestressed structure.
Technical characteristics of the bridge:
- Bridge scheme - 82 + 140 + 82 m;
- Total length - 317.70 m;
- Overall dimensions - G = 11.5 m + 2 х 0.75 m;
- Beam total width - 14.85 m.
The project was completed in 2 years.
Tweet
Share
Telegram
WhatsApp