Construction of bridges - Ukraine
Bridge in Kyiv region
After commencing work in Ukraine in 2009, EVRASCON Corporation was entrusted with a number of projects, including “The Bridge in the Kyiv Region”.
This project is a little difficult, because the foggy weather conditions significantly worsen the appearance of the area. Despite this, the project was completed on time, in just 1.5 years.
Technical characteristics of the bridge:
- Bridge over the drainage channel is designed:
- according to the scheme 30.1 + 48.0 + 30.1 m;
- full length - L = 109.0 m;
- dimension - F = 6.0 m; - The bridge span is taken as a monolithic continuous pre-stressed concrete beam B-40;
- The extreme supports of the bridge are designed on a high pile foundation from prismatic piles with a section of 35 x 35 cm;
- The bridge's middle supports are designed individually, of massive monolithic reinforced concrete construction on a low pile foundation of prismatic piles with a section of 35 x 35 cm.